Filter Results
Related Organization
- Biological and Environmental Systems Science Directorate (29)
- Computing and Computational Sciences Directorate (39)
- Energy Science and Technology Directorate (229)
- Fusion and Fission Energy and Science Directorate (24)
- Information Technology Services Directorate (3)
- Isotope Science and Enrichment Directorate (7)
- National Security Sciences Directorate (20)
- Neutron Sciences Directorate (11)
- Physical Sciences Directorate (138)
- User Facilities (28)
Researcher
- Diana E Hun
- Som Shrestha
- Isabelle Snyder
- Philip Boudreaux
- Rafal Wojda
- Tomonori Saito
- Bryan Maldonado Puente
- Nolan Hayes
- Prasad Kandula
- Subho Mukherjee
- Zoriana Demchuk
- Adam Siekmann
- Emilio Piesciorovsky
- Mahabir Bhandari
- Shiwanka Vidarshi Wanasinghe Wanasinghe Mudiyanselage
- Vandana Rallabandi
- Venugopal K Varma
- Vivek Sujan
- Aaron Werth
- Aaron Wilson
- Achutha Tamraparni
- Adam Aaron
- Alex Plotkowski
- Ali Riza Ekti
- Andre O Desjarlais
- Catalin Gainaru
- Charles D Ottinger
- Christopher Fancher
- Elizabeth Piersall
- Eve Tsybina
- Gary Hahn
- Gina Accawi
- Gurneesh Jatana
- Karen Cortes Guzman
- Kuma Sumathipala
- Marcio Magri Kimpara
- Mark M Root
- Mengjia Tang
- Mostak Mohammad
- Natasha Ghezawi
- Nils Stenvig
- Omer Onar
- Ozgur Alaca
- Peter Wang
- Praveen Kumar
- Raymond Borges Hink
- Shajjad Chowdhury
- Stephen M Killough
- Suman Debnath
- Venkatakrishnan Singanallur Vaidyanathan
- Viswadeep Lebakula
- Yarom Polsky
- Yifang Liu
- Zhenglai Shen

We’ve developed a more cost-effective cable driven robot system for installing prefabricated panelized building envelopes. Traditional cable robots use eight cables, which require extra support structures, making setup complex and expensive.

Misalignment issues of the PWPT system have been addressed. The intercell power transformer has been introduced in order to improve load sharing of the system during a mismatch of the primary single-phase coil and the secondary multi-phase coils.

We have been working to adapt background oriented schlieren (BOS) imaging to directly visualize building leakage, which is fast and easy.

Faults in the power grid cause many problems that can result in catastrophic failures. Real-time fault detection in the power grid system is crucial to sustain the power systems' reliability, stability, and quality.

Water heaters and heating, ventilation, and air conditioning (HVAC) systems collectively consume about 58% of home energy use.

The incorporation of low embodied carbon building materials in the enclosure is increasing the fuel load for fire, increasing the demand for fire/flame retardants.

An ORNL invention proposes using 3D printing to make conductors with space-filling thin-wall cross sections. Space-filling thin-wall profiles will maximize the conductor volume while restricting the path for eddy currents induction.

The traditional window installation process involves many steps. These are becoming even more complex with newer construction requirements such as installation of windows over exterior continuous insulation walls.