Filter Results
Related Organization
- Biological and Environmental Systems Science Directorate (29)
- Computing and Computational Sciences Directorate (39)
- Energy Science and Technology Directorate
(229)
- Fusion and Fission Energy and Science Directorate (24)
- Information Technology Services Directorate (3)
- Isotope Science and Enrichment Directorate (7)
- National Security Sciences Directorate (20)
- Neutron Sciences Directorate (11)
- Physical Sciences Directorate (138)
- User Facilities (28)
Researcher
- Diana E Hun
- Som Shrestha
- Philip Boudreaux
- Tomonori Saito
- Bryan Maldonado Puente
- Nolan Hayes
- Zoriana Demchuk
- Andrzej Nycz
- Chris Masuo
- Luke Meyer
- Mahabir Bhandari
- Peter Wang
- Shiwanka Vidarshi Wanasinghe Wanasinghe Mudiyanselage
- Venugopal K Varma
- William Carter
- Achutha Tamraparni
- Adam Aaron
- Alex Walters
- Andre O Desjarlais
- Bruce Hannan
- Catalin Gainaru
- Charles D Ottinger
- Easwaran Krishnan
- Gina Accawi
- Gurneesh Jatana
- James Manley
- Jamieson Brechtl
- Joe Rendall
- Joshua Vaughan
- Karen Cortes Guzman
- Kashif Nawaz
- Kuma Sumathipala
- Loren L Funk
- Mark M Root
- Mengjia Tang
- Muneeshwaran Murugan
- Natasha Ghezawi
- Polad Shikhaliev
- Stephen M Killough
- Theodore Visscher
- Venkatakrishnan Singanallur Vaidyanathan
- Vladislav N Sedov
- Yacouba Diawara
- Yifang Liu
- Zhenglai Shen

We’ve developed a more cost-effective cable driven robot system for installing prefabricated panelized building envelopes. Traditional cable robots use eight cables, which require extra support structures, making setup complex and expensive.

We have been working to adapt background oriented schlieren (BOS) imaging to directly visualize building leakage, which is fast and easy.

ORNL has developed a large area thermal neutron detector based on 6LiF/ZnS(Ag) scintillator coupled with wavelength shifting fibers. The detector uses resistive charge divider-based position encoding.

Estimates based on the U.S. Department of Energy (DOE) test procedure for water heaters indicate that the equivalent of 350 billion kWh worth of hot water is discarded annually through drains, and a large portion of this energy is, in fact, recoverable.

The incorporation of low embodied carbon building materials in the enclosure is increasing the fuel load for fire, increasing the demand for fire/flame retardants.

The traditional window installation process involves many steps. These are becoming even more complex with newer construction requirements such as installation of windows over exterior continuous insulation walls.