Filter Results
Related Organization
- Biological and Environmental Systems Science Directorate (23)
- Computing and Computational Sciences Directorate (35)
- Energy Science and Technology Directorate
(217)
- Fusion and Fission Energy and Science Directorate
(21)
- Information Technology Services Directorate (2)
- Isotope Science and Enrichment Directorate (6)
- National Security Sciences Directorate (17)
- Neutron Sciences Directorate (11)
- Physical Sciences Directorate (128)
- User Facilities (27)
Researcher
- Diana E Hun
- Philip Boudreaux
- Som Shrestha
- Tomonori Saito
- Andrzej Nycz
- Bryan Maldonado Puente
- Chris Masuo
- Hongbin Sun
- Luke Meyer
- Mahabir Bhandari
- Nolan Hayes
- Peter Wang
- Venugopal K Varma
- William Carter
- Zoriana Demchuk
- Achutha Tamraparni
- Adam Aaron
- Alex Walters
- Bruce Hannan
- Catalin Gainaru
- Charles D Ottinger
- Gina Accawi
- Gurneesh Jatana
- Ilias Belharouak
- Joshua Vaughan
- Karen Cortes Guzman
- Kuma Sumathipala
- Loren L Funk
- Mark M Root
- Mengjia Tang
- Natasha Ghezawi
- Polad Shikhaliev
- Pradeep Ramuhalli
- Praveen Cheekatamarla
- Ruhul Amin
- Shiwanka Vidarshi Wanasinghe Wanasinghe Mudiyanselage
- Singanallur Venkatakrishnan
- Stephen M Killough
- Theodore Visscher
- Vishaldeep Sharma
- Vladislav N Sedov
- Yacouba Diawara
- Zhenglai Shen

The invention presented here addresses key challenges associated with counterfeit refrigerants by ensuring safety, maintaining system performance, supporting environmental compliance, and mitigating health and legal risks.

We have been working to adapt background oriented schlieren (BOS) imaging to directly visualize building leakage, which is fast and easy.

ORNL has developed a large area thermal neutron detector based on 6LiF/ZnS(Ag) scintillator coupled with wavelength shifting fibers. The detector uses resistive charge divider-based position encoding.

The incorporation of low embodied carbon building materials in the enclosure is increasing the fuel load for fire, increasing the demand for fire/flame retardants.

The traditional window installation process involves many steps. These are becoming even more complex with newer construction requirements such as installation of windows over exterior continuous insulation walls.