Filter Results
Related Organization
- Biological and Environmental Systems Science Directorate (23)
- Computing and Computational Sciences Directorate (35)
- Energy Science and Technology Directorate
(217)
- Fusion and Fission Energy and Science Directorate (21)
- Information Technology Services Directorate (2)
- Isotope Science and Enrichment Directorate (6)
- National Security Sciences Directorate (17)
- Neutron Sciences Directorate (11)
- Physical Sciences Directorate (128)
- User Facilities
(27)
Researcher
- Diana E Hun
- Ali Passian
- Philip Boudreaux
- Som Shrestha
- Kyle Kelley
- Rama K Vasudevan
- Tomonori Saito
- Bryan Maldonado Puente
- Mahabir Bhandari
- Nolan Hayes
- Sergei V Kalinin
- Venugopal K Varma
- Zoriana Demchuk
- Achutha Tamraparni
- Adam Aaron
- Anton Ievlev
- Bogdan Dryzhakov
- Catalin Gainaru
- Charles D Ottinger
- Claire Marvinney
- Gina Accawi
- Gurneesh Jatana
- Harper Jordan
- Joel Asiamah
- Joel Dawson
- Karen Cortes Guzman
- Kevin M Roccapriore
- Kuma Sumathipala
- Liam Collins
- Mark M Root
- Marti Checa Nualart
- Maxim A Ziatdinov
- Mengjia Tang
- Nance Ericson
- Natasha Ghezawi
- Neus Domingo Marimon
- Olga S Ovchinnikova
- Peter Wang
- Shiwanka Vidarshi Wanasinghe Wanasinghe Mudiyanselage
- Singanallur Venkatakrishnan
- Srikanth Yoginath
- Stephen Jesse
- Stephen M Killough
- Steven Randolph
- Varisara Tansakul
- Yongtao Liu
- Zhenglai Shen

We have been working to adapt background oriented schlieren (BOS) imaging to directly visualize building leakage, which is fast and easy.

The invention introduces a novel, customizable method to create, manipulate, and erase polar topological structures in ferroelectric materials using atomic force microscopy.

High coercive fields prevalent in wurtzite ferroelectrics present a significant challenge, as they hinder efficient polarization switching, which is essential for microelectronic applications.

The incorporation of low embodied carbon building materials in the enclosure is increasing the fuel load for fire, increasing the demand for fire/flame retardants.

The traditional window installation process involves many steps. These are becoming even more complex with newer construction requirements such as installation of windows over exterior continuous insulation walls.