Skip to main content
SHARE
Publication

Progress on the Proton Power Upgrade at the Spallation Neutron Source

Publication Type
Conference Paper
Book Title
Proceedings of the 12th International Particle Accelerator Conference
Publication Date
Publisher Location
Geneva, Switzerland
Conference Name
International Particle Accelerator Conference (IPAC)
Conference Location
Campinas, Brazil
Conference Sponsor
IEEE, APS, and CNPEM
Conference Date
-

The Proton Power Upgrade Project at the Spallation Neutron Source (SNS) at Oak Ridge National Laboratory will double the proton power capability from 1.4 to 2.8 MW. This will be accomplished through an energy increase from 1.0 to 1.3 GeV and a beam current increase from 26 to 38 mA. The energy increase will be accomplished through the addition of 7 cryomodules to the linear accelerator (Linac). The beam current increase will be supported by upgrading several radio-frequency systems in the normal-conducting section of the Linac. Upgrades to the accumulator ring injection and extraction regions will accommodate the increase in beam energy. A new 2-MW-capable target and supporting systems will be developed and installed. Conventional facility upgrades include build-out of the existing klystron gallery and construction of a tunnel stub to facilitate future beam transport to the second target station. The project received approval to proceed with construction in October 2020. Procurements are in progress, and some installation activities have already occurred. Most of the installation will take place during three outages in 2022-2023. The project early finish is planned for 2025.