Abstract
Increasing penetration of inverter-based resources (IBRs) necessitates newer methods of planning and analysis of disturbances. The existing phasor-domain transient stability (TS) analysis may not capture the dynamics of IBRs during fault events. In this paper, electromagnetic transient (EMT) simulations using high-fidelity detailed model of power grid and one of the affected photovoltaic (PV) plants during the Angeles Forest disturbance in 2018 are performed. In these simulations, the processes to develop EMT models of power grid from traditional phasor-domain TS data and PV plant from collected data are described. Thereafter, using these simulations, the response of the PV plant during the fault event in 2018 is replicated and a sensitivity analysis is performed. The sensitivity analysis consists of making changes to the components within the PV plant and in the power grid to evaluate the impact they have on the response observed by the PV plant during the fault event. This analysis provides an understanding of the components that impact the operation of a PV plant during fault events and provide guidance to system planners on the studies that need to be performed to maintain a reliable power grid as new IBR plants are integrated.