Abstract
This paper gives an overview on on-going shielding analyses for Spallation Neutron Source. Presently, the most of the shielding work is concentrated on the beam lines and instrument enclosures to prepare for commissioning, save operation and adequate radiation background in the future. There is on-going work for the accelerator facility. This includes radiation-protection analyses for radiation monitors placement, designing shielding for additional facilities to test accelerator structures, redesigning some parts of the facility, and designing test facilities to the main accelerator structure for component testing. Neutronics analyses are required as well to support spent structure management, including waste characterisation analyses, choice of proper transport/storage package and shielding enhancement for the package if required.