September 2011

ORNL Report

Fiscal Year 2011 Infrastructure Refactorizations in AMP

By:
Berrill, Mark A; Philip, Bobby ; Sampath, Rahul S; Allu, Srikanth ; Barai, Pallab ; Cochran Jr, William K; Clarno, Kevin T; Dilts, Gary A
Publication Date:
September 2011
View DOI Listing:
https://doi.org/10.2172/1185319

Abstract

In Fiscal Year 2011 (FY11), the AMP (Advanced MultiPhysics) Nuclear Fuel Performance code [1] went through a thorough review and refactorization based on the lessons-learned from the previous year, in which the version 0.9 of the software was released as a prototype. This report describes the refactorization work that has occurred or is in progress during FY11.