March 2012

Journal

A Fusion Development Facility on the Critical Path to Fusion Energy

By:
Chan, V.; Stambaugh, R.
Journal Name:
Nuclear Fusion
Page Number:
N/A-N/A
Volume:
51
Issue Number:
8
Publication Date:
March 2012
View DOI Listing:
https://doi.org/10.1088/0029-5515/51/8/083019

Abstract

A fusion development facility (FDF) based on the tokamak approach with normal conducting magnetic field coils is presented. FDF is envisioned as a facility with the dual objective of carrying forward advanced tokamak (AT) physics and enabling the development of fusion energy applications. AT physics enables the design of a compact steady-state machine of moderate gain that can provide the neutron fluence required for FDF's nuclear science development objective. A compact device offers a uniquely viable path for research and development in closing the fusion fuel cycle because of the demand to consume only a moderate quantity of the limited supply of tritium fuel before the technology is in hand for breeding tritium.