Abstract
A conceptual design of the pulsed resonant charging power supply (RCPS) for the beam extraction system of the Spallation Neutron Source (SNS) at the Oak Ridge National Laboratory (ORNL) was previously reported at the 2019 IEEE Pulsed Power & Plasma Science Conference (PPPS 2019) [1]. Development and testing of the prototype supply continued through the year to finalize the design ahead of the Proton Power Upgrade (PPU). Testing revealed reliability issues with the original resonant charging scheme related to the step-up transformer core. Additional components were incorporated into the system, and some of the original prototype components were replaced to improve performance and reliability of the power supply. This paper describes the changes in the resonant charging scheme, presents the results of testing of the improved prototype at full power level, and shows the final design of the RCPS.