Key Links
John joined the Spallation Neutron Source as an electrical engineer supporting the Neutron Instruments in 2009. In 2012, he transitioned to the RF Group as a high power RF engineer. He currently serves as the RF Systems WBS Manager (L2) for the Proton Power Upgrade and the RF Systems Group Leader for the Accelerator Systems section in the Research Accelerator Division. The RF Group oversees the reliable operation of all Linac RF systems including the Front End, the normal and superconducting high power RF systems, the Ring RF systems, and the Low Level RF control systems.
Publications
May, 2026
Conference Paper
Python-EPICS RF Conditioning Automatic Control System at the Spallation Neutron Source
May, 2026
Conference Paper
Test cavity and Iris-to-Coax transition for tuning and high-power verification of SNS DTL iris couplers