June 2011

Conference Paper

Progress on the heating and current drive systems for ITER

By:
Jacquinot, J.; Beaumont, Bertrand; Bora, D.; Campbell, D.; Darbos, Caroline; Decamps, H.; Graceffa, J.; Gassmann, T.; Hemsworth, R.; Henderson, Mark; Kobayashi, N.; Lamalle, Philippe; Schunke, B.; Tanaka, M.; Tanga, A.; Albajar, F.; Bonicelli, T.; Saibene, G.; Sartori, R.; Becoulet, A.; Hoang, G. T.; Inoue, T.; Sakamoto, K.; Takahashi, K.; Watanabe, K.; Goulding, Richard H; Rasmussen, David A; Swain, David ; Chakraborty, A.; Mukherjee, A.; Rao, S. L.; Denisov, G.; Nightingale, M.; Sonato, P.
Journal Name:
Fusion Engineering and Design
Page Number:
125-130
Volume:
84
Issue Number:
2-6
Publication Date:
June 2011
Conference Name:
25th Symposium on Fusion Technology
Conference Location:
Rostock, Germany
View DOI Listing:
https://doi.org/10.1016/j.fusengdes.2009.01.100

Abstract

The electron cyclotron (EC), ion cyclotron (IC), heating-neutral beam (H-NB) and, although not in the day 1 baseline, lower hybrid (LH) systems intended for ITER have been reviewed in 2007/2008 in light of progress of physics and technology in the field. Although the overall specifications are unchanged, notable changes have been approved. Firstly, it has been emphasized that the H&CD systems are vital for the ITER programme. Consequently, the full 73 MW should be commissioned and available on a routine basis before the D/T phase. Secondly, significant changes have been approved at system level, most notably: the possibility to operate the heating beams at full power during the hydrogen phase requiring new shine through protection; the possibility to operate IC with 2 antennas with increased robustness (no moving parts); the possible increase to 2 MW of key components of the EC transmission systems in order to provide an easier upgrading of the EC power as may be required by the project; the addition of a building dedicated to the RF power sources and to a testing facility for acceptance of diagnostics and heating port plugs. Thirdly, the need of a plan for developing, in time for the active phase, a CD system such as LH suitable for very long pulse operation of ITER was recognised. The review describes these changes and their rationale.


Related Researchers