- By:
- Cheverton, Richard D; Nanstad, Randy K; Baldwin, Charles A; Blakeman, Edward D; Dickson, Terry L; Kmieciak Jr, Henry A; Remec, Igor
- Publication Date:
- August 2010
Abstract
Dosimetry and vessel-material surveillance data were obtained from HFIR in 2004 and 2005, respectively. The dosimetry data have been used to correct calculated values of the neutron and gamma dpa rates at locations of the surveillance specimens and close to the vessel HB-2 beam tube nozzle regions, where radiation damage is the greatest, and at other vessel regions as well. A new surveillance data point was obtained and added to the existing data base to obtain an updated HFIR vessel materials radiation-embrittlement trend curve. Both the dosimetry data and the updated radiation-embrittlement trend curve indicate a somewhat greater embrittlement rate than previously estimated. To continue to satisfy existing criteria and to achieve a vessel life of ~50 EFPY (100 MW), it is recommended that the time between periodic hydrostatic proof tests be reduced from 3 to 2 EFPY (100 MW) between operating times of 24 and 34 EFPY (100 MW) and that pressures for the pressure-safety-limit (PSL) pressure/temperature-limit curve be reduced by 9 psi at 40F and 22 psi at 120F with proportionate reductions between these extreme temperatures.