OAK RIDGE COMPETITIVE ELECTRICITY DISPATCH (ORCED) MODEL

 

Reports

 

Presentations

 

Model and Data

 

Links

 

Contacts

 

THE ORCED PROGRAM AND DATA FILES
FOR THE TEN NERC REGIONS
The files needed to run the ORCED model for each of the ten NERC regions are bundled into a self-extracting winzip file.  Each bundled file contains four files: (1) the ORCED model procedures file, which describes how to run the program and alter the input data; (2) the ORCED program file already set up to run for the given NERC region, and two data input files.  The data input files consist of  (1) the EIA power plant dispatch and economics data and (2) RDI Powerdat per unitized load duration data based on hourly load data.  The last two files are only needed if the user wishes to alter technical and cost information of the power plants and the load duration information.
NERC Region Data Filename* Filesize**
East Central Area Reliability Coordination Agreement (ECAR)
ECAR.exe

1,545 KB

Electric Reliability Council of Texas (ERCOT) ERCOT.exe

1,064 KB

Florida Reliability Coordinating Council (FRCC) FRCC.exe

980 KB

Mid-Atlantic Area Council (MAAC)  MAAC.exe

1,170 KB

Mid-America Interconnected Network, Inc. (MAIN) MAIN.exe

1,297 KB

Mid-Continent Area Power Pool (MAPP) MAPP.exe

1,454 KB

Northeast Power Coordinating Council (NPCC) NPCC.exe

1,824 KB

Southeastern Electric Reliability Council (SERC) SERC.exe

1,665 KB

Southwest Power Pool (SPP) SPP.exe

1,457 KB

Western Systems Coordinating Council (WSCC) WSCC.exe

2,299 KB

*Left or Right Mouse Click to Download and Save
**All of the files are self-extracting zip files
GO BACK