Clinton Engineering Works

DOE PHOTOGRAPH. Ed Westcott, Army Corp of Engineers, in his dark room at Clinton Engineer Works, Oak Ridge, 1945.
Ed Westcott in photography laboratory at Clinton Engineer Works, Oak Ridge, May 4, 1945. Image provided by DOE.
Clinton Engineer Works, Separation Building, Exhaust Duct, Building 206, November 11, 1943.
Clinton Engineer Works, Canal, Building 105, Looking East, June 4, 1943.
Clinton Engineer Works, Storage and Lubrication Building, April 1943
Clinton Engineer Works, TNX Area, Steam Plant, Building 805, June 10, 1943.
Clinton Engineer Works, Pile Building, Building 105, Looking east, June 4, 1943.
Clinton Engineer Works, Panoramic View of TNX Area Looking Northwest, April 15, 1943.
Clinton Engineer Works, TNX Area, Main Laboratory Building, Building 706A, June 10, 1943.
Clinton Engineer Works, Building 105, X-10, June 1943
Clinton Engineer Works, Process Building and Stack 205, June 1943
Clinton Engineer Works Construction
Clinton Engineer Works Construction. Stack foundation.
X-10 Clinton Engineer Works, Loading Face of Pile, Graphite Reactor
X-10 Graphite Reactor Main Control, Pile Operation, Clinton Engineer Works
Clinton Engineer Works, First Aid and Service House, Building 719, Looking Northwest 3/13/44
Clinton Engineer Works Construction
Clinton Engineer Works Construction, Tank TH-4 under construction, June 1, 1943
Clinton Engineer Works, Exhaust Duct, Building 105, Looking North, 7/14/43
Clinton Engineer Works Construction
Clinton Engineer Works, Carbutizer and Storage Building 105-E, Looking Southeast, 7/14/43
Clinton Engineer Works Construction
Clinton Engineer Works, TNX AREA, X-10 Semi Works Construction, 6/27/43
Clinton Engineer Works Construction
X-10 Clinton Engineer Works, Semi Works Construction
Propane Storage Tanks, Clinton Engineer Works, Building 726, Looking Northeast, October 11, 1943.
Clinton Engineer Works, Temporary Construction Area, Looking Southwest, March 25, 1944.
Clinton Engineer Works, River Pump House, Building 814, Looking East, June 10, 1943.
Clinton Engineer Works, Boiler House, Building 801, Looking Northwest, March 13, 1944.
X-10 Clinton Engineer Works, Cell Banks Control Panel
Storage Platform, Clinton Engineer Works, Building 714, Looking Southeast, 11/11/43
Laboratory Building, Clinton Engineer Works, Building 706-B, Looking Southeast, 10/11/43
Overhead Water Storage Tank, Clinton Engineer Works, Building 815, Looking East, 7/14/45
X-10 Clinton Engineer Works, Control for Pile Fan
Clinton Engineer Works Construction
Chemical Research Equipment, X-10 Clinton Engineer Works
Clinton Engineer Works Boiler House, Building 801, Looking Northwest, 5/22/43
Clinton Engineer Works Construction
Clinton Engineer Works Construction
Clinton Engineer Works, Boiler House and Reservoir, Building 801, 802, 7/14/43
Construction, Clinton Engineer Works
X-10 Building, Clinton Engineer Works
X-10 Building, Clinton Engineer Works Construction
Water Storage Tower, Clinton Engineer Works
Filter Plant, Clinton Engineer Works, Building 813, Looking Southeast, 11/11/43
Water Treatment House, Clinton Engineer Works, Building 807, Looking North, 10/11/43
Buildings, Clinton Engineer Works
Clinton Engineer Works, Building 105, Concrete Batch Plant, Looking West, 5/22/43
Clinton Engineer Works, 105 Building Protection, Looking East, 6/4/43
Aerial View of Clinton Engineer Works, original ORNL site, including the Graphite Reactor and the 100 and 200 Process Areas, October 1943. First facility in the X-10 area.
Construction Excavation and Forms, Clinton Engineer Works, Building 205, May 1, 1943. Initial footers for building 3019.
Exhauster Building, Clinton Engineer Works, Building 115, Looking East, 10/11/43
Exhauster Building, Clinton Engineer Works, Building 115, Looking Northeast, 11/11/43
Retention Basin, Clinton Engineer Works, Building 206, Looking South, 10/11/43
TNX Building, Graphite Reactor, Clinton Engineer Works, 11/9/43
1943 Construction, Clinton Engineer Works
Clinton Engineer Works, Main Office Overflow Building, Building 703-B, March 13, 1944.
Clinton Engineer Works, Special Machine Shop, Building 305 Looking Northeast, March 13, 1944.
Clinton Engineer Works, Shop and Supply Storage House, Building 717-A, March 13, 1944.
Laboratory Building 766, looking northeast, Project 9735, Clinton Engineer Works, March 13, 1944.
X-10 Building, Clinton Engineer Works
X-10 Building, Clinton Engineer Works
X-10 Building, Clinton Engineer Works
X-10 Clinton Engineer Works, Experimental Thermal Neutron Column
X-10 Clinton Engineer Works, Hoods and Centrifuges, Final Isolation
X-10 Clinton Engineer Works, Hot Laboratory Remote Control
Clinton Engineer Works Construction
Clinton Engineer Works, TNX Area, First Aid Building, June 10, 1943.
Clinton Engineer Works Construction, early 1940's.
Clinton Engineer Works Construction, early 1940's.
Administration buildings at Clinton Engineer Works, X-10.
X-10 Clinton Engineer Works, Apparatus for Radioactive Material
Cooling Water Ponds, Clinton Engineer Works, Building 206, Looking Northeast, 10/11/43
Constructing the concrete hot cells on the south side of the chemical separations building 205 looking northeast. Clinton Engineer Works, November 11, 1943. In 1992, this Radiochemical Development Facility (Building 3019) was designated a Nuclear Historic Landmark by the American Nuclear Society.
Clinton Engineer Works Construction, mid 1940's.
X-10 Clinton Engineer Works, Semi Works Construction
Main control room for the chemical separations pilot plant. Remote controls for the plutonium separations process in the adjacent hot cells, Clinton Engineer Works (CEW), 1944.
Aerial View of Clinton Engineer Works X-10 Plant Area Looking East, March 10, 1944.
X-10 Building, Clinton Engineer Works