There are two versions of each directives document. What you see on this screen is the text version of this document; it may not contain all of the graphics, forms, etc., and is provided for casual reviewing and searching. The PDF version of this document is the official version and is an exact replica of the original; it contains all the graphics, images, tables, equations, and forms.
Oak Ridge Office
ORO O 210
Revision 2
DATE: 09/11/2007
SUBJECT: PERFORMANCE
MEASURES AND ANALYSIS
1. PURPOSE. This Directive provides detailed requirements for Oak Ridge Office (ORO) activities under Series 210, PERFORMANCE MEASURES AND ANALYSIS, by assigning responsibility and accountability and providing administrative and/or contractual guidance to ORO and its contractors.
2. CANCELLATION. This revision cancels and replaces ORO O 210, Revision 1, PERFORMANCE MEASURES AND ANALYSIS, dated September 28, 2006.
3. SIGNIFICANT CHANGES. This Directive incorporates as Chapters in the 210 Series the current ORO Directives identified in Paragraph 4 below.
4. SUMMARY.
a. This revision to ORO O 210 transmits the following revised Chapter.
(1) Chapter II, Change 1, ORO OPERATING EXPERIENCE PROGRAM, dated May 9, 2007.
For information on applicability and assignment of responsibility, refer to these individual Chapters.
5. CONTRACTOR REQUIREMENTS DOCUMENT. For contractor requirements, refer to the attachments to the Chapters listed in Paragraph 4 above.
Original
Signed By
Wayne H. Albaugh, Team Leader
Directives Management Group
TABLE OF
CONTENTS
CHAPTER I – RESERVED
CHAPTER II – ORO OPERATING EXPERIENCE PROGRAM (correlates to DOE O 210.2 and DOE –STD-7501-99)