Items* |
Inspectors* |
Frequency |
| Belts,
Body Harness, Lanyards |
G.
F. Waddell |
Receiving |
| Filters
for Respirators (cartridges, canisters) |
W.
A. Callahan |
Receiving |
| A.
E. Fadden |
Receiving |
| Containers/Packaging
(DOT) |
G.F.
Waddell |
Receiving |
| Coveralls,
Anti-contamination* |
G.F.
Waddell |
Receiving |
| Cylinders,
Gas |
G.F.
Waddell |
Receiving/Per
Request |
| Filters,
HEPA to be installed in ventilation systems to protect
workers and the environment (not vacuum cleaner or room
purifier filters for nuisance dust, etc.) |
ETTP
Test Facility, BJC |
|
| Fixed
Ladders |
C.
R. Carpenter |
Installation
3-5 years |
| J.
M. Pryor |
| Heavy
Mobile Equipment (mobile cranes)/Forklifts/Tailgate
Lifts/Trailers |
J.
M. Extine |
Initial/Annual |
| HEPA
Filtered Vacuum Cleaners (replacement vacuum filters are
delivered to owner and tested by QE&I after
installation) |
T.
E. Schubert |
Per
Request
Rad use/Annual |
| Hoists/Hoisting
Equipment |
J.
M. Extine |
Initial/Annual |
| Portable
Ladders |
G.
F. Waddell |
Receiving |
| Pallet
Trucks/Lift Trucks |
J.
M. Extine |
Initial/Annual |
| Pressure
Vessels (air receivers, heat exchangers) |
H.
E. Freeman |
Initial/2
Yr |
| J.
M. Pryor |
| Regulators
(all except those with MSA supplied air respiratory
equipment) |
G.
F. Waddell |
Receiving/Repaired/per
Request |
| Regulators
(only those with MSA supplied air respiratory equipment) |
I&C,
Verify***** |
|
| Rescue
Lifting Tripods |
J.
M. Extine |
Initial |
| Respirators,
Respiratory Protection |
W.
A. Callahan |
Receiving
Prior to Re-issue |
| A.
E. Fadden |
| Slings
(alloy chain, wire rope, synthetic web, fiber rope, choker) |
J.
M. Extine |
Receiving/Initial
Alloy Chain/Annual |
| Valves,
Safety and Relief |
H.
E. Freeman |
Receiving
1 Yr-Toxic/Corr
2 Yr-inert
3 Yr-P/T
5 Yr-Steam Distr |
| Welding
Equipment (oxygen/acetylene mixing barrels, cutting
attachments, torches) |
G.F.
Waddell |
Receiving/Per
Request |
| Work
Platforms, Powered |
J.
M. Extine |
Initial/Annual |
| *
Inspections for these items for the Research Reactors
Division are performed by their Quality Inspector. |