DOE Closure Process for Necessary and Sufficient Sets of Standards (54 out of 99) The PDF version is an exact image of the original document.
Related Documents
DOE G 450.3-1 Text Version PDF Version
DOE G 450.3-2 Text Version PDF Version
DOE P 450.3 Text Version PDF Version
DOE G 450.3-3 Text Version PDF Version



DOE M 450.3-1
1-25-96

March 1, 1996

MEMORANDUM FOR ALL DEPARTMENTAL ELEMENTS

FROM:     Archer L. Durham /s/
          Assistant Secretary for
          Human Resources and Administration

SUBJECT:  DOE M 450.3-1, THE DEPARTMENT OF ENERGY CLOSURE PROCESS FOR NECESSARY
          AND SUFFICIENT SETS OF STANDARDS

Pursuant to the Office of Environment, Safety and Health's concurrence of February
26, 1996,  the attached subject Manual, previously approved on January 25, 1996,
is being issued for simultaneous implementation and coordination for a six-month
period.  This document is being published in conjunction with the issuance of the
Secretarial Policy Statement, DOE P 450.3, AUTHORIZING THE USE OF THE NECESSARY
AND SUFFICIENT PROCESS FOR STANDARDS-BASED ENVIRONMENT, SAFETY AND HEALTH
MANAGEMENT and DOE N 450.3, USE OF THE NECESSARY AND SUFFICIENT PROCESS, approved
on January 25, 1996.  These documents were prepared by the Department's Standards
Committee under the leadership of the Assistant Secretary for Environment, Safety
and Health (ES&H).  The documents authorize use of the Necessary and Sufficient
Process which addresses how the Department will select its standards to protect
workers, the public, and the environment; and, form the basis for the Department's
move to integrating standards activities into a consistent, coordinated system of
standards-based safety management.  

DOE M 450.3-1, THE DEPARTMENT OF ENERGY CLOSURE PROCESS FOR NECESSARY AND
SUFFICIENT SETS OF STANDARDS is hereby approved for simultaneous implementation
and coordination.

Attachment



DATE:          MARCH 4, 1995

REPLY TO
ATTN OF:       CORPORATE MANAGEMENT PRACTICES GROUP, HR-62 /s/

SUBJECT:       DOE N 450.3, USE OF THE NECESSARY AND SUFFICIENT PROCESS, DOE M
               450.3-1, THE DEPARTMENT OF ENERGY CLOSURE PROCESS, AND DOE P
               450.3, AUTHORIZING USE OF THE NECESSARY AND SUFFICIENT PROCESS 

TO:            DIRECTIVES POINTS OF CONTACT

The attached Notice and Manual are forwarded for your review and comment.  Both
the Notice and Manual are being simultaneously implemented and coordinated.  These
documents are being published in conjunction with the approval and issuance of the
Secretarial Policy Statement on Authorizing the Use of the Necessary and
Sufficient Process (N&S) for standards-based environment, safety and health (ES&H)
management.

The N&S Process is one means of addressing the selection of ES&H standards, and
has been developed by the Department Standards Committee (DSC) as part of the ES&H
standards program as defined in the "criteria for the Department's Standards
Program" (DOE/EH-0416).  The use of the N&S Process is encouraged, but is not
mandatory.  The DSC and sub-teams developed the N&S Process over the past year,
with an awareness that the relationship between the Department's work, associated
hazards, and requirements/standards has not always been clear.  Overcoming this
difficulty will require Departmental Elements to work in partnership across
program lines and to use the N&S Process to build agreements on standards in the
front end of work planning.  

In implementing the N&S Process, the Department recognizes that a transition
period will be required.  The Policy Statement authorizes application of the
Process where substantial benefit can be realized.  The Notice provides
requirements and guidance for the transition to widespread use of the N&S Process. 
If the N&S Process is to be used, the Manual is mandatory and must be followed. 

Comments on the Notice and Manual are due by September 2, 1996.  MAJOR ISSUES OR
SUGGESTED COMMENTS should be designated as such when submitted.  MAJOR ISSUES
shall be limited to instances where a directive in its entirety, or its
requirements, would have a serious, adverse affect on mission accomplishment,
economy, efficiency, policy, objectives, or other management concerns that would
preclude its publication.  The following procedures shall be followed for the
submission of comments:

Directives Points of Contact at Headquarters Elements:  Submit comments to Ms.
Maggie Sturdivant, Department Standards Committee Support Group, EH-31,
CENTXXI/GTN; send facsimiles to (301) 903-0557, INTERNET address:
MAGGIE.STURDIVANT@HQ.DOE.GOV; or forward via electronic mail.  Submit a second set
of comments to Ms. Susan C. Smith, Corporate Management Practices Group, HR-62,
Room 4B-222, FORRESTAL; send facsimile to (202) 586-9585, INTERNET address:
TEST6.HR05@HQ.DOE.GOV; or cc-mail to HR05, TEST6. 

Directives Points of Contact at Field Elements:  Submit consolidated field and contractor
comments to Ms. Sturdivant at one of the addresses given in the preceding paragraph.  Send an
additional copy to Ms. Smith.

Operations Offices will send an additional copy to the Associate Deputy Secretary for Field
Management.

CONTRACTOR ORGANIZATIONS:  Submit comments directly to their appropriate Field
Elements.

CONTACTS:  Questions concerning the content of the Notice and Manual should be directed to
Ms Sturdivant, EH-31, (301) 903-0077.  Questions concerning the processing of the Notice and
manual should be directed to Ms. Smith, HR-62, (202) 586-3296.


Attachments

                                                                  DOE M 450.3-1

                                                             1-25-96


SUBJECT:  THE DEPARTMENT OF ENERGY CLOSURE PROCESS FOR NECESSARY AND
SUFFICIENT               SETS OF STANDARDS

1.   PURPOSE.  In 1994, the Department Standards Committee (DSC) established an integrated
     standards-based management system, which is reflected in the "Criteria for the Department's
     Standards Program" (DOE/EH/0416).  The Criteria's primary objective is to promote a
     culture based on Environment, Safety, and Health (ES&H) standards tailored to work and to
     move away from a "one size fits all" approach.  The Criteria establishes the expectations of
     how DOE personnel, contractors, and other interested parties should interact in defining
     standards necessary for performing work, integrating those standards into the process for
     planning and accomplishing work, evaluating the efficacy of the standards in light of current
     missions, and continuously assessing the effectiveness of the standards in providing adequate
     protection to the worker, the public, and the environment.

     One of the DSC's first tasks was to encourage a common understanding that the
     Department's work should be planned, performed, and appropriately documented in
     accordance with a set of agreed-upon standards to ensure adequate protection of the safety
     and health of workers, the public, and the environment.  The DSC recognized that a key to
     the success of the Department Standards Program is the availability of a process that
     provides a disciplined and collaborative analysis of the work to be performed and the
     potential hazards associated with that work.

     The DSC charged a Standards Process Action Team (SPAT 3/4) to develop a Department-
     wide process for identifying the standards necessary and sufficient to ensure adequate
     protection against the hazards associated with the work of the Department.  The draft
     Closure Process produced by the Standards Process Action Team was successfully
     demonstrated by several pilots at a variety of activities, facilities, and sites throughout the
     DOE complex.

2.   SUMMARY.  This Manual describes the six elements established for the "Closure Process
     for Necessary and Sufficient Sets of Standards," herein referred to as the Process, and
     summarizes "lessons learned" from the pilots.  The Process can be applied at any
     organizational level and by any organization within the DOE complex, and can be used to
     establish contractual commitments between the Department and its contractors.

     The pilots demonstrated that several intangible benefits accrue when the Process is
     conducted properly to tailor sets of standards to specific work and hazards.  One benefit is
     the enhanced communication among DOE, contractors, and Stakeholders, fostering a better
     understanding of the work and the hazards and acceptance of a set of standards.  Feelings of
     synergy, team spirit and empowerment were created among the various team members and
     teams.  In the longer term, more tangible benefits will include measurable improvements in
     the performance of Department work.  

     The pilots also demonstrated that the following aspects of the Process required clarification:

     a.   The role of the Process needs to be understood within the larger context of the
          Department's Standards Program.  In the "big picture," the Process provides for the
          establishment of an agreed upon, necessary and sufficient set of standards, which
          then must be implemented in the performance of work.  Responsibility for
          implementation will be addressed by the management infrastructure already in place. 
          Likewise, the responsibility for oversight to confirm effective performance is defined
          by current management systems.

     b.   If conducted properly, the Process is intended to produce a set of necessary and
          sufficient standards appropriately tailored to specific work to be performed and the
          hazards associated with that work.  The set will include all applicable requirements
          in Federal, State, and local laws and regulations.  Other sources of potential
          standards are DOE directives, DOE Technical Standards, and nationally and
          internationally recognized industry consensus standards.

     c.   The six Process Elements, when followed, ensure the integrity of the Process and
          provide a readily defensible response if the set of standards is challenged.  Because
          these elements were intentionally written in performance-based terms, they do not
          form a prescriptive checklist.  Therefore, the conduct of the Process and the
          approaches followed to implement the elements will vary.  This is to be expected. 
          However, inherent in these Process Elements are five principles that should guide all
          users of the Process.

          (1)  To establish a basis for agreement, all parties who must agree on the set of
               standards shall participate in the Process planning.

          (2)  Additional Stakeholders (i.e., parties who are materially affected by or who
               can materially affect the outcome) are always invited to contribute to the
               Process.

          (3)  People properly qualified by experience and training identify and confirm the
               set of standards.

          (4)  The Process shall be documented and the necessary and sufficient set of
               standards confirmed to demonstrate that the Process has been applied
               properly.

          (5)  The approved set of standards shall be accepted by all Departmental Elements
               as the basis for the performance of work and of oversight.

          Experience shows that approval of the necessary and sufficient set of standards is
          readily obtained if the Process Elements are followed and the principles are fulfilled.

     d.   The justification of the necessary and sufficient set includes identification of any
          implementation assumptions and interfaces.  Implementation assumptions are a
          mechanism by which uncertainties in the work process are addressed.  These
          assumptions may deal with management issues such as the availability of resources,
          hardware issues such as the availability of control systems, or process issues such as
          the compatibility of materials used in accomplishing the work.  Interfaces relate to
          the relationship between the requirements associated with the work to be performed
          and others beyond the scope of that work.  These requirements may be organizational
          as in the case of work specific training requirements as a subset of a larger set of
          requirements, hardware requirements as in the case of a Heating Ventilation and Air
          Conditioning (HVAC) system serving the work area as a segment of a larger HVAC
          system, or programmatic requirements as in the case of quality assurance
          requirements for the work in the context of a larger quality assurance program. 
          These interface requirements must be identified and satisfied before work can
          proceed.

     e.   Depending on the complexity or controversy surrounding a particular situation, the
          Convened Group responsible for planning and conducting a particular necessary and
          sufficient process may decide that confirmation by an independent team is needed to
          support approval of the set.  This is a matter of judgment to be exercised by the
          Convened Group.

          To provide as much flexibility as possible, the Process permits the Convened Group
          to designate the level and identity of the Approval Authority during the initiation of
          the Process.  The Approval Authority will approve the set as adequate on the basis of
          a determination that the Process has been correctly implemented.

     f.   The value of affording all appropriate Stakeholders an opportunity to contribute to
          the Process cannot be overemphasized.  The value of inviting Stakeholders to provide
          their views, even when they decline, has been proven by experience.  Because
          acceptance of the set is one of the underlying goals of the Process, the appropriate
          Stakeholders should always be informed of the intent to conduct the Process and be
          invited to contribute input.  Consistent with guidance related to the Federal Advisory
          Committee Act, Stakeholders (i.e., individuals who are not Federal employees or
          Department contractor or subcontractor employees) provide their individual views on
          issues raised by the Process, but may not be members of the consensus seeking
          groups.  The Convened Group must ensure that Stakeholders are provided with
          appropriate opportunities for input, and that their views are shared in a manner
          consistent with the Federal Advisory Committee Act.


          Care should be taken to ensure that the degree of rigor and the resources applied for
          specific application of the Process are appropriate for the degree of complexity of the
          work and hazards.  The scope, detail, and rigor of hazard analysis and work
          definition, the amount and detail of process documentation, the size and composition
          of the team(s), and the degree of expertise and independence needed for team
          members may vary widely between different applications.  For example, the Process
          should be relatively simple and inexpensive in situations where the work and
          associated hazards are well-understood and commonly accepted in the private sector
          and widely accepted standards exist for controlling those hazards.  

     To ensure a common understanding of the Department's new approach to performing work,
     programs to orient managers not directly participating in the Process and to train Process
     participants are being made available through the Department Standards Committee.  Future
     participants in the Process must have completed the appropriate training course prior to
     participation.

3.   CONTACT.  Questions concerning this Manual should be addressed to the Department
     Standards Committee at (301) 903-0077.

BY ORDER OF THE SECRETARY OF ENERGY:




                                   ARCHER L. DURHAM
                                   Assistant Secretary for
                                   Human Resources and Administration
DOE M 450.3-1                                                        i (and ii)
1-25-96

                              TABLE OF CONTENTS


CHAPTER I - INITIATING THE NECESSARY AND SUFFICIENT PROCESS 

1.   OBJECTIVE.....................................................................................................................I-1
2.   DISCUSSION.................................................................................................................. I-1

CHAPTER II - PRODUCING A NECESSARY AND SUFFICIENT SET OF STANDARDS

1.   OBJECTIVE..............................................................II-1
2.   PROCESS ELEMENT 1:  DEFINING THE WORK AND HAZARDS......................II-1
     a.   Objective........................................................II-1
     b.   Discussion.......................................................II-1
     c.   Responsibilities.................................................II-2
3.   PROCESS ELEMENT 2:  CREATING THE TEAM(S)...............................II-3
     a.   Objective........................................................II-3
     b.   Discussion.......................................................II-3
     c.   Responsibilities.................................................II-4
4.   PROCESS ELEMENT 3:  DEFINING AND AGREEING TO PROTOCOLS AND
     DOCUMENTATION REQUIREMENTS FOR THE TEAM(S)...........................................II-5
     a.   Objective........................................................II-5
     b.   Discussion.......................................................II-5
     c.   Responsibilities.................................................II-5
5.   PROCESS ELEMENT 4:  IDENTIFYING THE NECESSARY AND SUFFICIENT SET OF
     STANDARDS..............................................................II-6
     a.   Objective........................................................II-6
     b.   Responsibilities.................................................II-6
6.   PROCESS ELEMENT 5:  CONFIRMING THE NECESSARY AND SUFFICIENT
     SET OF STANDARDS.......................................................II-7
     a.   Objective........................................................II-7
     b.   Responsibilities.................................................II-7
7.   PROCESS ELEMENT 6:  APPROVING THE NECESSARY AND SUFFICIENT SET OF
     STANDARDS AND AUTHORIZING WORK TO THE SET........................................II-8
     a.   Objective........................................................II-8
     b.   Discussion.......................................................II-8
     c.   Responsibilities.................................................II-8

CHAPTER III - USE OF THE APPROVED SET OF STANDARDS..........................III-1
     
                                  CHAPTER I
                                      
               INITIATING THE NECESSARY AND SUFFICIENT PROCESS

1.   OBJECTIVE.  To determine whether to initiate the Process and to assign responsibility for
     conducting the Process.

2.   DISCUSSION.

     a.   Agreement Parties may initiate the Process if one or more of the following criteria is
          satisfied.

          (1)  A set of standards does not exist, as in the case of a new activity.

          (2)  An existing set of standards (e.g., the current set of all applicable Department
               directives) is no longer appropriate due to changes in mission, regulatory
               environment, degree of hazards, performance expectation, or knowledge.

          (3)  The applicable contract requires that the Process be used.

          (4)  A Stakeholder demonstrates to the satisfaction of the Agreement Parties that
               the existing set of standards is either not necessary or not sufficient to provide
               adequate protection.  Evidence provided should be based on the set of
               standards, not on the way the standards are implemented.

     b.   When the Agreement Parties determine that at least one of the criteria is satisfied,
          they:

          (1)  jointly designate, preferably within the Responsible Organization, a Process
               Leader who will be responsible for conducting the Process,

          (2)  designate individuals within their respective organizations to serve as
               members of the Convened Group, 

          (3)  identify Resource Authorities and any other Federal officials to be approached
               for participation as members of the Convened Group, and

          (4)  identify interested Stakeholders to be approached to provide input to the
               Convened Group.

          The value of inviting Stakeholder contribution, even when it merely provides them
          with an opportunity to decline, has been proven by experience.  Because acceptance
          of the set is one of the underlying goals of the Process, the appropriate Stakeholders
          should always be informed of the intent to conduct the Process and be invited to
          contribute.

     c.   The designation of individuals as members of the Convened Group should be guided
          by Criterion 6 of the "Criteria for the Department's Standards Program"
          (DOE/EH/0416), which states that identification, approval, and maintenance of
          necessary and sufficient sets of standards will be at the organizational level
          appropriate for effective management.  In general, members of the Convened Group
          shall be selected from the lowest level of management responsible for allocating
          resources and managing the work affected by the necessary and sufficient set of
          standards.  Members of the Convened Group must be empowered to make the
          necessary commitments on behalf of their organizations.

     d.   The Process Leader will convene the first meeting of the Convened Group.  The first
          business of the Convened Group will be to decide on the protocols for its ongoing
          meetings and to identify individuals who have agreed to act as the Approval
          Authority for Process Element 6 (Chapter II, paragraph 7), "Approving the Necessary
          and Sufficient Set of Standards and Authorizing Work to the Set."                                 CHAPTER II
                                      
            PRODUCING A NECESSARY AND SUFFICIENT SET OF STANDARDS

1.   OBJECTIVE.  To produce and reach closure on a necessary and sufficient set of standards
     to meet performance expectations and objectives for providing adequate protection to
     workers, the public, and the environment.

     a.   This phase consists of the following six major Process Elements.

          (1)  Defining the work and hazards.

          (2)  Creating the team(s).

          (3)  Defining and agreeing to protocols and documentation requirements for the
               team(s).

          (4)  Identifying the necessary and sufficient set of standards.

          (5)  Confirming the necessary and sufficient set of standards.

          (6)  Approving the necessary and sufficient set of standards and authorizing work
               to the set.

          As understanding is gained through use of the Process, it will often be necessary to
          repeat the various elements to incorporate changes to the scope, expectation, team(s),
          or set of standards.

     b.   The level of detail and effort required for each of the elements will vary depending
          on the particular application and experience in applying the Process.  For example,
          the element on "defining work and hazards" will require less effort for established
          and ongoing activities than for a new startup.

2.   PROCESS ELEMENT 1:  DEFINING THE WORK AND HAZARDS.

     a.   Objective.  To define the work and performance expectations to which the standards
          apply.

     b.   Discussion.  A clear definition of the work performance expectations, work
          environment, and associated hazards and uncertainties is critical to the successful
          identification of a necessary and sufficient set of standards.  Tailoring a necessary
          and sufficient set of standards to the work and hazards ensures that the desired level
          of protection is achieved efficiently.

          The definition of the work and hazards provides an opportunity to determine if any
          of the identified hazards can be reduced or eliminated (e.g., by the use of alternative
          materials or methods).  

          Such redefinition of the work should occur prior to starting Process Element 4,
          "Identifying the Necessary and Sufficient Set of Standards."

     c.   Responsibilities.

          (1)  Process Leader has the following responsibilities.

               (a)  Acquires relevant information on the work to be performed from the
                    members of the Convened Group.

               (b)  Organizes information received from the Convened Group as an initial
                    basis for identifying the necessary and sufficient set of standards, in
                    terms of the following initial conditions.

                    1    Performance expectation and objectives (for example, goals for
                         safety, quality, and operations).

                    2    What actions will be performed.

                    3    Physical conditions within which the work will be performed.

                    4    Materials and conditions that could cause adverse
                         consequences.

                    5    Uncertainties about the work.

                    6    Organization and management.

                    7    Resource availability and constraints.

                    8    Stakeholder concerns.

               (c)  If necessary, re-evaluates the work definition on the basis of feedback
                    obtained during the Process.

          (2)  The Convened Group has the following responsibilities.

               (a)  Establishes appropriate channels of communication with Stakeholders;
                    provides Stakeholders with information concerning process activities;
                    and obtains Stakeholder views as input to the Process.

               (b)  Provides information on initial conditions as follows:

                    1    Agreement Parties, with the assistance of Technical and
                         Operational Experts, provide information on:

                         a    Performance expectations and objectives (for example,
                              goals for safety, quality, and operations).

                         b    What actions will be performed.

                         c    Physical conditions within which the work will be
                              performed.

                         d    Materials and conditions that could cause adverse
                              consequences

                         e    Uncertainties about the work.

                         f    Organization and management

                    2    Resource Authorities provide information on Resource
                         availability and constraints.

               (c)  Endorses the initial definition of the work, hazards, and performance
                    expectations compiled by the Process Leader.  The initial definition is
                    subject to refinement during the application of the Process.

3.   PROCESS ELEMENT 2:  CREATING THE TEAM(S).

     a.   Objective.  To create one or more teams to identify a necessary and sufficient set of
          standards and confirm that the set is adequate and feasible.

     b.   Discussion.

          (1)  The identification of a necessary and sufficient set of standards for a defined
               scope of work relies on the collective judgment of a team of knowledgeable
               people.  The team must establish that implementation of the set is feasible
               and that the set provides a basis for adequate protection.

          (2)  Confirmation of the adequacy and feasibility of the necessary and sufficient
               set of standards strengthens the credibility of the Process and confidence in
               the set of standards.  The level of formality and independence of the
               confirmation process will depend on the specific circumstances.  For complex
               or controversial issues, it will be necessary to use relatively rigorous methods
               for confirmation, perhaps even a formal, independent peer review.

          (3)  The nature of the work, its complexity, hazards, and uncertainties will
               determine the breadth of knowledge needed within the identification and
               confirmation team(s).  It is important that the criteria for selecting team
               members reflect the full breadth of issues to be addressed, and that qualified
               individuals are made available for assignment of the team(s).  The
               confirmation team may include members of the identification team or be an
               entirely independent group.

          (4)  When the relevant expertise is not available in the organizations directly
               involved, it will be necessary to seek input from experts from other
               organizations inside or outside of the DOE complex.  Input from experts from
               other organizations has the benefit of enhancing the credibility and
               defensibility of the Process and of the resulting set of necessary and sufficient
               standards.  When consulting with experts from outside the DOE complex,
               individual viewpoints must be sought.

          (5)  Based on consideration of the Federal Advisory Committee Act, membership
               on the Identification Team and Confirmation Team is limited to DOE and
               other Federal employees and DOE contractor and subcontractor employees. 
               Stakeholder input to the Process will be managed by the Convened Group.

     c.   Responsibilities.  The Convened Group has the following responsibilities.

          (1)  Define the specifications for the identification and confirmation team(s) that
               will be formed.

               (a)  Establish the functions, relationships, and composition of the team(s)
                    based on:

                    1    the complexity of the work or the existing set of standards to
                         be reviewed;

                    2    the number of disciplines (technical and otherwise) involved;
                         and

                    3    the extent to which the relevant communities (i.e., technical,
                         scientific, programmatic, and Stakeholder) are known to hold
                         differing opinions on the issues under review.

               (b)  Establish team member qualifications.

          (2)  Arrange for individuals to be assigned to the team(s), consistent with the
               membership criteria.  Individuals assigned to the team(s) must be able to
               participate fully in all team meetings and team decision making.




4.   PROCESS ELEMENT 3:  DEFINING AND AGREEING TO PROTOCOLS AND
     DOCUMENTATION REQUIREMENTS FOR THE TEAM(S).

     a.   Objective.  To establish protocols, agreements, and documentation requirements for a
          credible and efficient Process.

     b.   Discussion.  The degree of formality and the extent of documentation required will
          depend on the work and the following considerations:  (1) the potential impact of the
          identified hazards and associated uncertainties of the work, (2) the complexity of the
          work, and (3) the quality and rigor required to provide confidence that the standards
          selected meet the performance expectations and objectives of the work.

          The protocols should reflect the intention that the team(s) will perform most of their
          deliberations in face-to-face group meetings.  If subgroups must be used,
          coordination responsibilities of the subgroups must be adequately defined.

     c.   Responsibilities.

          (1)  The Convened Group has the following responsibilities.

               (a)  Establish protocols and agreements for:

                    1    schedules and time limitations;

                    2    resolution of differing opinions within the Convened Group and
                         the team(s);

                    3    interactions between the Convened Group and the team(s); and

                    4    interactions between the Convened Group and the Stakeholders

               (b)  Establish documentation requirements for:

                    1    definition of the work, hazards, and performance expectations
                         and objectives;

                    2    the necessary and sufficient set of standards;

                    3    justification for the set's adequacy:

                         a    team member names, responsibilities, and qualifications;

                         b    results of the confirmation process;

                         c    differing opinions and their resolution;

                    4    implementation assumptions and interfaces necessary for
                         reaching closure on the set (e.g., any unique resource
                         requirements, or any time constraints for the use of certain
                         selected standards); and

                    5    justifications to support exemptions from legal requirements;

          (2)  The Process Leader, with the participation of team members, has the
               following responsibilities.

               (a)  Establish team protocols, as necessary for:

                    1    establishing team members' roles and responsibilities;

                    2    orienting team members on the Necessary and Sufficient
                         Process;

                    3    developing plans and procedures, including schedules and cost
                         estimates;

                    4    resolving team comments within the team (differing opinions
                         that cannot be resolved within the team will be handled in
                         accordance with the protocol established by the Convened
                         Group); and

                    5    interacting with non-members when it is necessary to clarify
                         information included in the definition of work and hazards.

               (b)  Establish any additional team documentation requirements necessary.

          (3)  Team members will provide qualifications information to the Convened
               Group.  Team members must conduct the Process in accordance with the
               protocols and documentation requirements.

5.   PROCESS ELEMENT 4:  IDENTIFYING THE NECESSARY AND SUFFICIENT SET OF
     STANDARDS.

     a.   Objective.  To identify and reach team consensus on the necessary and sufficient set
          of standards by drawing on the team's collective experience.

     b.   Responsibilities.  The Identification Team has the following responsibilities.

          (1)  Identify any additional information needed to define the work.

          (2)  Evaluate relevant sources of existing international, national, State, local, and
               work-specific standards including laws, regulations, orders, and procedures.

          (3)  Identify which standards constitute a necessary and sufficient set, including
               those standards that are legally required and other standards that are necessary
               to provide adequate protection of workers, the public, and the environment. 
               The set must be feasible for implementation.

          (4)  If needed, request additional resources, such as additional Technical or
               Operational Experts.

          (5)  Reach consensus on and justify the necessary and sufficient set of standards.

          (6)  Identify any implementation assumptions and interfaces used by the team.

          (7)  Identify those applicable Federal, State, and local laws and regulations that
               must be included in the necessary and sufficient set of standards but are
               judged not to add value to the achievement of adequate protection, and
               provide a justification for the team's view that can be used as the basis for
               pursuing exemption from these requirements.

          (8)  If it is not possible to identify a necessary and sufficient set to meet the
               current performance expectations and objectives, recommend revisions to the
               work definition, development of new standards, or both, that would allow a
               necessary and sufficient set of standards to be identified.

          (9)  Document:

               (a)  the necessary and sufficient set of standards,

               (b)  the justification for the set,

               (c)  implementation assumptions and interfaces, and

               (d)  a justification to support an exemption from regulatory requirements
                    that are judged by the team not to add value to the achievement of
                    adequate protection.

6.   PROCESS ELEMENT 5:  CONFIRMING THE NECESSARY AND SUFFICIENT SET OF
     STANDARDS.

     a.   Objective.  To confirm the adequacy and feasibility of the necessary and sufficient
          set of standards identified by the Identification Team.

     b.   Responsibilities.  The Confirmation Team has the following responsibilities.

          (1)  Review the documentation produced by the Identification Team and any other
               documentation required for confirmation.

          (2)  Determine whether the proposed set of standards is adequate and feasible.

          (3)  Document the confirmation activities and their results.

7.   PROCESS ELEMENT 6:  APPROVING THE NECESSARY AND SUFFICIENT SET OF
     STANDARDS AND AUTHORIZING WORK TO THE SET.

     a.   Objective.

          (1)  To accept the level of protection provided by implementation of the necessary
               and sufficient set of standards.

          (2)  To accept and authorize the use of the necessary and sufficient set of
               standards, subject to any implementation assumptions.

     b.   Discussion.

          (1)  Approval constitutes agreement with the adequacy of the set and a
               commitment by the Resource Authorities to provide, or seek through the
               normal budget process, the resources necessary to implement the standards.

          (2)  Approval does not constitute approval of exemptions from standards in
               applicable laws and regulations that have been judged not to add value to the
               achievement of adequate protection.  Exemption from those standards must be
               sought and granted in accordance with the applicable provisions for such
               exemptions.  For DOE nuclear safety regulations, an exemption request, and
               the justification contained therein, will be processed in accordance with 10
               CFR 820.

     c.   Responsibilities.  The Approval Authority designated by the Convened Group has the
          following responsibilities.

          (1)  Establish the adequacy of the necessary and sufficient set of standards by
               determining whether:

               (a)  the Process has been correctly implemented and has been documented
                    in conformance with the protocols established by the Convened Group;

               (b)  the Identification Team has endorsed and justified the set of standards
                    as necessary and sufficient to provide adequate protection when
                    implemented; and               (c)  the Confirmation Team has confirmed the adequacy and feasibility of
                    the set of standards.

          (2)  Approve or disapprove the set of standards for use in performing the defined
               work, within any time limitations established by the Convened Group.

          (3)  Inform the Convened Group of the approval or disapproval.                                 CHAPTER III
                                      
                    USE OF THE APPROVED SET OF STANDARDS

To ensure that the expectations and agreements established between the Responsible Organization
and the Customer Organization are successfully implemented, the Responsible Organization:

1.   ensures that the necessary and sufficient set of standards and associated implementation
     assumptions become part of the operating basis for all activities covered by the set; and

2.   performs any agreed upon actions approved with the set.

Planning and performing work in accordance with the approved set of standards requires an
adequate system for managing the work.  This includes an organization with defined roles and
responsibilities, performance evaluation systems, and management information and reporting
systems that include configuration and change controls.  An implicit assumption for all necessary
and sufficient sets of ES&H standards is that such a management system exists.  Characteristics of
a desirable integrated management system are addressed in the "Criteria for the Department's
Standards Program" (DOE/EH/0416).                                 DEFINITIONS

1.   Agreement Party.  Any party, including at a minimum the Responsible Organization and
     the Customer Organization, that must agree to the necessary and sufficient set of standards
     for the work; for example, parties to a contract, as in the case of DOE and an M&O
     contractor.

2.   Approval Authority.  One or more Department and contractor employees designated by the
     Convened Group to determine the adequacy of the necessary and sufficient set of standards
     and to approve or disapprove a set of standards.

3.   Confirmation Team.  A group of individuals who meet the membership criteria and
     qualifications defined by the Convened Group with responsibility for confirming the
     adequacy and feasibility of the necessary and sufficient set of standards based on
     documentation provided by the Identification Team.

4.   Convened Group.  A steering committee for the conduct of the Process, which represents
     the Agreement Parties, the Resource Authority, and other appropriate Federal organizations. 
     The Convened Group establishes the criteria for approval of the set of standards identified
     by the Identification Team and must, therefore, consist of organizational representatives
     empowered to make the necessary commitments.

5.   Customer Organization.  The organization with direct responsibility, accountability, and
     authority for having the work performed subject to the agreed-upon set of standards.

6.   Identification Team.  A group of individuals who meet the membership criteria and
     qualifications defined by the Convened Group and are responsible for identifying and
     justifying the necessary and sufficient set of standards based on the work, the performance
     expectations, and the associated hazards and uncertainties defined in Process Element 1.

7.   Operational Experts.  Individuals with knowledge and expertise relevant to the work and
     the site, facility, and activities addressed by the necessary and sufficient set of standards.

8.   Resource Authorities.  Organizations or individuals with control over and authority to
     commit the equipment, facilities, personnel, and budget necessary to accomplish the work. 
     For example, line managers are typical resource authorities in classical organizations. 
     Program and project managers are typical resource authorities in matrix organizations.  Some
     organizations may have resource managers who are independent of programs and projects.

9.   Responsible Organization.  The organization with direct responsibility, accountability, and
     authority for performing the work subject to the agreed-upon set of standards.

10.  Stakeholder.  Any party other than Federal employees or DOE contractor or subcontractor
     employees that will be materially affected by, or can materially affect, the outcome of the
     work, either favorably or unfavorably (for example, representatives of State, and local
     governments, labor unions, and citizens' groups.

11.  Technical Experts.  Individuals with knowledge and expertise relevant to the work or to
     one of the environment, safety and health disciplines (for example, industrial hygiene,
     criticality control, or industrial safety).
<>