HB1A upgrade in progress


click on photo for larger version

P0001836
filter and M1 mounts in cubicle (filter in place)
P0001835
a little closer view
DCP00796
filter and M1 mounted
P0001838
HB1 shutter/collimator unit in place in front of HB1A filter and M1 mounts
DCP00822
a close fit!
DCP00825
filter and M1 shown behind shutter/collimator unit
DCP00828
M1 looking through HB1 shutter/collimator window
CostaNPlug
Costa beside the HB1A beam port plug
filter_good_2101
looking down the beam port plug at the filter
mono_897
looking down the beam port plug at M1
HB1A M2 938
M2 shield mounted in place
IMG_150
Ed Blackburn mounting the sample axis support plate
IMG_159
sample axis support plate in postion
IMG_157
the THK rails are delivered! 1000mm rails

circular rail to linear rail transition plate

circular/linear transition plate, analyzer axis transition plate held by Scott Moore

circular/linea transition plate with analyzer axis transition plate
DCP00951
rail layout
HB1A rail system layout
design layout of the rail system
Roll 74 - 8
the rail support plates arrive
Roll 75 - 7
the wall "before"
Roll 75 - 8
covered in preparation of taking the block down
Roll 75 - 15
block part of wall down
Roll 75 - 30
where the wall was
Roll 76 - 1
wall going up
Roll 76 - 2
the wall "after"
Roll 76 - 3
room gained at spectrometer detector arm position
Roll 79 - 2
rails on the plates and in position
Roll 79 - 8
1000 mm rail bearing blocks
Roll 79 - 13
500 mm rail bearing blocks and sample pedestal
Roll 79 - 14
adaptor plates and linear rails installed
Roll 79 - 15
view of rails relative to M2 and HB1 drum
Roll 79 - 16
close-up of adaptor plate stack
Roll 79 - 17
rails as they cross the trench